{"id":46559,"date":"2017-09-07T17:34:01","date_gmt":"2017-09-07T21:34:01","guid":{"rendered":"https:\/\/brocku.ca\/brock-news\/?p=46559"},"modified":"2017-09-07T17:34:01","modified_gmt":"2017-09-07T21:34:01","slug":"goodman-construction-to-cause-temporary-detour-saturday","status":"publish","type":"post","link":"https:\/\/brocku.ca\/brock-news\/2017\/09\/goodman-construction-to-cause-temporary-detour-saturday\/","title":{"rendered":"Goodman construction to cause temporary detour Saturday"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Construction on the Goodman School of Business expansion project will mean a one-day detour on campus this Saturday.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">On Sept. 9, pedestrian traffic from the bus shelters in front of Schmon Tower to Thistle complex north\u00a0will be rerouted from its regular path.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Construction vehicles will be moving to and from the Goodman construction zone while work is underway to relocate a fire hydrant. This will result in traffic being redirected to east of Taro Hall or along University Rd. to Scotiabank Hall. Throughout the day, construction personnel will be directing outgoing and incoming traffic to ensure pedestrian safety.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">One accessible ramp, at the end of Issac Brock Blvd. E. near the corner of the Goodman site, will be blocked off for the day. The ramp will again be accessible on Sunday, Sept. 10. An alternative accessible ramp is available to the east of the Tower in front of Brock&#8217;s Student-Alumni Centre.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Anyone with questions or concerns regarding this work can contact project manager Janet Muenzberger at x5017 or <\/span><a href=\"mailto:jmuenzberger@brocku.ca\"><span style=\"font-weight: 400;\">jmuenzberger@brocku.ca<\/span><\/a><span style=\"font-weight: 400;\">, or Lesley Owen at x5949 or <\/span><a href=\"mailto:lowen@brocku.ca\"><span style=\"font-weight: 400;\">lowen@brocku.ca<img decoding=\"async\" loading=\"lazy\" class=\"alignright wp-image-46560 size-full\" src=\"https:\/\/brocku.ca\/brock-news\/wp-content\/uploads\/2017\/09\/Taro-Hall-hydrant-relocation.jpg\" alt=\"\" width=\"3268\" height=\"2380\" \/><\/span><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction on the Goodman School of Business expansion project will mean a one-day detour on campus this Saturday.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[54],"tags":[158,53,5762],"_links":{"self":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/posts\/46559"}],"collection":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/comments?post=46559"}],"version-history":[{"count":0,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/posts\/46559\/revisions"}],"wp:attachment":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/media?parent=46559"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/categories?post=46559"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/tags?post=46559"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}