{"id":27700,"date":"2014-04-23T13:14:15","date_gmt":"2014-04-23T18:14:15","guid":{"rendered":"http:\/\/brocku.ca\/brock-news\/?p=27700"},"modified":"2014-04-23T13:18:42","modified_gmt":"2014-04-23T18:18:42","slug":"brock-preparing-for-planned-power-shutdowns","status":"publish","type":"post","link":"https:\/\/brocku.ca\/brock-news\/2014\/04\/brock-preparing-for-planned-power-shutdowns\/","title":{"rendered":"Brock preparing for planned power shutdowns"},"content":{"rendered":"<p style=\"text-align: center;\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-27702\" title=\"substation1\" src=\"http:\/\/brocku.ca\/brock-news\/wp-content\/uploads\/2014\/04\/substation1.jpg\" alt=\"substation1\" width=\"640\" height=\"360\" \/><\/p>\n<p>After working around the clock Easter weekend to restore power to the University, Brock&#8217;s <a href=\"https:\/\/brocku.ca\/facilities-management\" target=\"_blank\">Department of Facilities Management<\/a> is preparing for planned shutdowns in the coming weeks.<\/p>\n<p>Brock&#8217;s annual substation maintenance is slated for May 9-10. Starting May 9 at 9 p.m. and ending May 10 at 10 a.m., the following areas of Brock will be affected:<br \/>\n\u2022\tAll of Mackenzie Chown, including Inniskillin<br \/>\n\u2022\tEarp Residence<br \/>\n\u2022\tStudent Centre<br \/>\n\u2022\tTaro Hall<br \/>\n\u2022\tPlaza<\/p>\n<p>Maintenance to Brock&#8217;s two high voltage feeders April 26 has been cancelled, and <a href=\"https:\/\/www.horizonutilities.com\/pages\/default.aspx\" target=\"_blank\">Horizon Utilities<\/a> will reschedule. Brock experienced an unplanned power interruption last weekend because of a failed high voltage feeder during maintenance. Repairs were made to the line April 22, and Brock returned to normal operation April 23 at 6 a.m.  Brock&#8217;s cogenerator plant continued to run throughout the outages, providing power to critical buildings and systems.<\/p>\n<p>For more information, contact <a href=\"mailto:dcorbett@brocku.ca\" target=\"_blank\">Dave Corbett<\/a>, Electrical Services manager.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>After working around the clock Easter weekend to restore power to the University, Brock&#8217;s Department of Facilities Management is preparing for planned shutdowns in the coming weeks.<\/p>\n","protected":false},"author":1,"featured_media":27702,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[1820,1824,53,1188,965,1823,445,1821,1822],"_links":{"self":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/posts\/27700"}],"collection":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/comments?post=27700"}],"version-history":[{"count":7,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/posts\/27700\/revisions"}],"predecessor-version":[{"id":27707,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/posts\/27700\/revisions\/27707"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/media\/27702"}],"wp:attachment":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/media?parent=27700"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/categories?post=27700"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/tags?post=27700"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}