{"id":22600,"date":"2013-05-11T08:50:38","date_gmt":"2013-05-11T13:50:38","guid":{"rendered":"http:\/\/brocku.ca\/brock-news\/?p=22600"},"modified":"2013-05-11T08:51:07","modified_gmt":"2013-05-11T13:51:07","slug":"update-power-outage-planned-for-parts-of-main-campus-this-weekend","status":"publish","type":"post","link":"https:\/\/brocku.ca\/brock-news\/2013\/05\/update-power-outage-planned-for-parts-of-main-campus-this-weekend\/","title":{"rendered":"UPDATE: Power outage planned for parts of main campus completed"},"content":{"rendered":"<div id=\"attachment_22602\" style=\"width: 563px\" class=\"wp-caption aligncenter\"><a class=\"highslide\" onclick=\"return vz.expand(this)\" href=\"http:\/\/brocku.ca\/brock-news\/wp-content\/uploads\/2013\/05\/power-outage-banner-1024x5761.jpg\"><img aria-describedby=\"caption-attachment-22602\" decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-22602\" title=\"power-outage-banner-1024x5761\" src=\"http:\/\/brocku.ca\/brock-news\/wp-content\/uploads\/2013\/05\/power-outage-banner-1024x5761.jpg\" alt=\"power-outage-banner-1024x5761\" width=\"553\" height=\"311\" \/><\/a><p id=\"caption-attachment-22602\" class=\"wp-caption-text\">   <\/p><\/div>\n<p>All buildings that were <a href=\"http:\/\/brocku.ca\/brock-news\/?p=22528\">involved in the Annual Planned Electrical Shutdown<\/a> currently have power.<\/p>\n<p>Buildings include the Schmon Tower, Thistle Complex, Decew Residence, Vallee Residence and the Central Utilities Building.<\/p>\n<p>Facilities Management staff are currently completing walkthroughs of the buildings checking all systems are working properly. All buildings are expected to reopen at 10 a.m. as scheduled.<\/p>\n<p>The Cairns Complex is scheduled to reopen today at 12 noon.<\/p>\n<p>All other buildings on the University&#8217;s main and east campuses were not impacted by the shutdown and have normal power and will open as regularly scheduled.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>All buildings that were involved in the Annual Planned Electrical Shutdown currently have power. Buildings include the Schmon Tower, Thistle Complex, Decew Residence, Vallee Residence and the Central Utilities Building.<\/p>\n","protected":false},"author":1,"featured_media":22602,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[1037,53],"_links":{"self":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/posts\/22600"}],"collection":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/comments?post=22600"}],"version-history":[{"count":7,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/posts\/22600\/revisions"}],"predecessor-version":[{"id":22608,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/posts\/22600\/revisions\/22608"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/media\/22602"}],"wp:attachment":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/media?parent=22600"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/categories?post=22600"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/tags?post=22600"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}