{"id":21954,"date":"2013-04-16T10:19:06","date_gmt":"2013-04-16T15:19:06","guid":{"rendered":"http:\/\/brocku.ca\/brock-news\/?p=21954"},"modified":"2013-04-16T10:19:06","modified_gmt":"2013-04-16T15:19:06","slug":"cairns-complex-pedestrian-bridge-closed-for-three-weeks","status":"publish","type":"post","link":"https:\/\/brocku.ca\/brock-news\/2013\/04\/cairns-complex-pedestrian-bridge-closed-for-three-weeks\/","title":{"rendered":"Cairns Complex pedestrian bridge closed for three weeks"},"content":{"rendered":"<div id=\"attachment_21956\" style=\"width: 514px\" class=\"wp-caption aligncenter\"><img aria-describedby=\"caption-attachment-21956\" decoding=\"async\" loading=\"lazy\" class=\"size-large wp-image-21956\" title=\"cairns-bridge\" src=\"http:\/\/brocku.ca\/brock-news\/wp-content\/uploads\/2013\/04\/cairns-bridge-1024x576.jpg\" alt=\"The pedestrian bridge connecting the Chown Complex and Cairns Complex will be closed until May 6\" width=\"504\" height=\"283\" \/><p id=\"caption-attachment-21956\" class=\"wp-caption-text\">The pedestrian bridge connecting the Chown Complex and Cairns Complex will be closed until May 6<\/p><\/div>\n<p>Members of the Brock community using the pedestrian bridge that connects the Chown Complex to the Cairns Complex will have to take a detour for the next three weeks.<\/p>\n<p>The East Bridge that links the third floors of both facilities will be closed until May 6.<\/p>\n<p>This closure is to accommodate a significant construction change to the doors located at each end of the bridge.<\/p>\n<p>&#8220;The project team will be reconfiguring the doors, tearing out the frames and inverting their operation,&#8221; says Scott Johnstone, facility manager, Cairns Family Health and Bioscience Research Complex.<\/p>\n<p>&#8220;It is a significant change because they also have to rewire and recertify the security and fire systems related to both buildings at each end of the bridge.&#8221;<\/p>\n<p>The repair will enhance access and security of both buildings.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Members of the Brock community using the pedestrian bridge that connects the Chown Complex to the Cairns Complex will have to take a detour for the next three weeks. The East Bridge that links the third floors of both facilities will be closed until May 6.<\/p>\n","protected":false},"author":1,"featured_media":21956,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[205,158,965],"_links":{"self":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/posts\/21954"}],"collection":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/comments?post=21954"}],"version-history":[{"count":4,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/posts\/21954\/revisions"}],"predecessor-version":[{"id":21959,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/posts\/21954\/revisions\/21959"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/media\/21956"}],"wp:attachment":[{"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/media?parent=21954"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/categories?post=21954"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/brocku.ca\/brock-news\/wp-json\/wp\/v2\/tags?post=21954"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}